Infrastructure archive
Every Infrastructure story, newest first. 1,325 stories
39 stories
- Energy Transition
Nextpower patent and 2 GW backlog headline the wire
The headline carries two claims; the supplied record carries nothing else, so the commercial read is inference.
- Data centers & fiber
Zayo locks in Corning fiber for 15,000-mile AI buildout
A tripled route-mile target gets the supply-chain certainty to match its ambition.
- Data centers & fiber
J.G. Petrucci files 100MW Allentown data center plan
The project's substation-first structure is a bet on power scarcity.
- Data centers & fiber
Hudson River Trading signs multi-billion-dollar AI cloud deal with CoreWeave
The trading firm will run AI research on Nvidia systems, with no dollar figure, capacity number, or schedule made public.
- Fundraising
Swift Current's $750m credit facility leaves terms undisclosed
Renewables Now reports the size, but not who is lending or at what rate.
- Data centers & fiber
InfraTech plans $2.7B Texas data center and fiber buildout
A 5,000-acre site in the Texas Panhandle and a fiber manufacturing bet, with no tenant or manufacturing partner named.
- Data centers & fiber
Kyivstar and Ukrtelecom share fiber to stop parallel network builds
An open-access deal lets two Ukrainian carriers sell internet over each other's fiber.
- The Wrap
Atesh claims three Kursk comms towers destroyed
Atesh's Telegram post is the only account of the strike, and it fits a year-long pattern of attacks on Russian military communications.
- Energy Transition
Microsoft's Qcells pact ties data center load to virtual power plants
The expanded deal pairs data center load with dispatchable batteries, putting data center capital behind a new layer of flexible grid capacity.
- Energy Transition
Enercon secures EUR 1bn guarantee facility, Renewables Now reports
The trade outlet confirms the facility's existence and purpose, but the terms that would let the market price it have not been disclosed.
- Data centers & fiber
Keel decommissions all four US Bitcoin mines in AI pivot
The former Bitfarms has the cash and the sites. It still needs a signed tenant contract.
- Energy Transition
Hep Global's Regensburg groundbreaking comes without numbers
The construction is confirmed. The figures that would let anyone price it are not.
- Energy Transition
A 15-GW headline, an article that verifies nothing
The item behind the headline is a subscription pitch, so the claimed installed base cannot be checked or priced.
- Energy Transition
Pacifico's 2.1 GW Korean wind clearance: claim, not deal
A trade-press headline flags a 2.1 GW Korean wind project, but the public record offers no details behind it.
- Data centers & fiber
Norway Green Energy pulls its 50MW Panay data center plan
A hostile public consultation preceded the withdrawal; Panay now has no active data center proposal.
- Energy Transition
Plug Power said to drop 100-MW Antwerp green hydrogen project
A reported 100-MW cancellation makes plain that green hydrogen economics run on offtake contracts.
- Energy Transition
Mahindra Susten reaches financial close on 151-MW Indian hybrid
Financing is closed on an Indian wind-solar hybrid, but the terms that would let an investor price the deal remain unseen.
- Transport & public-private
Brest port lands EUR 58m floating-wind hub award
Brest's EUR 58m award for a floating-wind hub is a number with no project behind it.
- Data centers & fiber
Upper Merion denies five-site King of Prussia data center plan
The denial removes 4.6 million square feet of proposed capacity as Pennsylvania tightens its data center rules.
- Data centers & fiber
I Squared backs Saragon with up to $1B for edge data centers
The platform opens with ten former Sprint switching sites in nine US markets and a mandate to buy more.
- Data centers & fiber
Openreach extends XGS-PON expansion, lifting full-fiber top speed to 8.5Gbps
The faster tier reaches more than a million premises in its first year, and Openreach says the wider push will take new construction and equipment work.
- Fundraising
Capital Dynamics acquires 170-MW four-hour BESS in Ireland
The wire item confirms a buyer and a battery, but leaves the seller, site, and price unstated.
- Energy Transition
OMV's e-methanol offtake from Kasso PtX lacks disclosed size
The announcement names the buyer and the project, but the source material carries no volume, price, or timing data.
- Energy Transition
LG Energy's Michigan launch leaves specs unstated
The public record of the battery plant launch contains no capacity, chemistry, or offtake details.
- Energy Transition
Island Green's UK battery permit leaves revenue undefined
Ten megawatts of storage for every megawatt of solar makes this a battery project with solar attached; the permit leaves out the commercial terms that would underwrite it.
- Transport & public-private
Tennessee Choice Lanes P3 has a winner and no name
The feed extract confirms a decision for a flagship US transport P3 but withholds the winning team.
- Data centers & fiber
Eight Globalstar satellites reach orbit as Amazon deal looms
The first satellites in a 17-satellite replenishment are now in orbit, securing the emergency SOS network Apple relies on and Amazon is about to own.
- Energy Transition
JA Solar to supply modules for New Zealand's largest rooftop array
A supply contract whose public record stops at a headline, with capacity and ownership still undisclosed.
- Data centers & fiber
Bitdeer has pre-sold half of a Malaysian AI data center for $400 million
A five-year deal for half the 9.5MW facility shows how AI cloud providers lock in revenue before a building goes live.
- Data centers & fiber
Bloom's Power Connect pre-fabricates the data center power plant
The factory-built platform moves wiring and testing off the job site, with Oracle, Equinix, and American Electric Power already lined up as customers.
- Energy Transition
Rezolv's 192 MW Romanian wind farm enters trial operation
Construction risk is gone. The power-purchase terms that would price the asset are not in the public record.
- Data centers & fiber
Twenty markets hold most of the world's hyperscale data center capacity
Northern Virginia alone accounts for 11 percent of global capacity, and power and permitting are already redrawing the list.
- Energy Transition
China's storage fleet hits 136 GW
The 84% growth is the news; the detail behind it is not public.
- Energy Transition
Distributed Sun Seeds US Platform trutility
A backer and a name are public; the size, mandate, and structure are not.
- Energy Transition
Tohoku Electric and Nichirei wind PPA: names, then silence
A Renewables Now headline pairs a Japanese utility and a corporate buyer on wind power; the public record stops at the announcement.
- Energy Transition
Bhutan solar MoU leaves the Indian partner unnamed
Renewables Now's headline names no counterparty, capacity, or timeline for the solar agreement.
- Energy Transition
Appalachian Power launches 800 MW storage tenders
Renewables Now reported the 800 MW target; the terms that would define the deal are not in the public text.
- Energy Transition
Atome's 300 MW Paraguay solar plan comes without offtake terms
A utility-scale array feeding an electrolysis load depends on the power purchase agreement the report does not disclose.
- Energy Transition
APA's $184M Queensland solar-BESS plan: a headline, a paywall, no numbers
Renewables Now's item carries the figure; the offtake details that would size the deal are not in the public text.
1 story
- Energy Transition
Burgum lauds LG battery plant as DOE cancels corridors
A cabinet endorsement doesn't substitute for missing capacity, offtake, and grid numbers.