Infrastructure archive
Every Infrastructure story, newest first. 1,315 stories
40 stories
- Data centers & fiber
Pennsylvania pulls AI data centers off the fast track
Governor Shapiro's order makes local sign-off and full-grid-cost payments prerequisites for state permits.
- Fundraising
Infrastructure fundraising data runs deeper than the top ten
Infrastructure Investor's database tracks 3,700 funds and more than 4,000 investors and managers behind the ten largest raises.
- Energy Transition
EDF's 400 MW Nevada solar PPA headline carries no terms
The available extract shows only a headline and a subscription pitch; buyers, sites, and pricing are absent.
- Data centers & fiber
Nvidia weighs $3B SB Energy investment behind OpenAI's Ohio campus
Nvidia's guarantee, more than its equity, is what would make the $500 billion project financeable.
- Data centers & fiber
CVC DIF to take majority stake in German data center operator Firstcolo
The value-add fund is betting a 24MW Frankfurt build can turn a near-full colocation platform into a broader German player.
- Energy Transition
Germany awards 2.1 GW in oversubscribed solar tender
The available record is a headline and a subscription pitch, leaving demand visible and economics unstated.
- Fundraising
KKR to buy EDF's North American businesses, P3 Bulletin reports
A one-line headline without terms points to a major utility portfolio shifting into private-fund hands.
- Energy Transition
Vestas books 306 MW for unnamed US wind projects
The order is on record; the projects are not yet named — a thin disclosure that leaves the financing question open.
- The Wrap
The IBD talent war opens a wirehouse front
Cetera pulled two groups from Commonwealth and Raymond James took a team from Wells Fargo on the same Monday. The fight for independent advisors now runs on two fronts.
- Data centers & fiber
DataVita raises £300m as state guarantee backs AI campus debt
A £202 million National Wealth Fund guarantee sits behind £252.5 million of senior debt on DataVita's CoreWeave-contracted Scottish campus.
- Energy Transition
DOE cancels three transmission corridors, citing 'Green New Scam'
Federal backing disappears for lines once justified on reliability grounds, raising the political risk premium for interregional sponsors.
- Fundraising
Thin record for Inox Clean's Vena Energy India acquisition
The only public trace of the deal is a Renewables Now headline dated Aug 19; no terms have surfaced.
- Energy Transition
Egypt-Renergy solar item arrives with a future date
A headline dated six months out is the only support for a 3.1 GW solar-storage project claim.
- Energy Transition
Sosteneo signs 350 MW German wind platform for Fund II debut
The Generali-owned infrastructure manager enters Germany with a majority stake in an 11-project onshore wind fleet, keeping the operator on as a minority shareholder.
- Energy Transition
Wind headline names MEAG; details absent
A trade item flags a Texas wind exit, but the public record offers no numbers.
- Energy Transition
Renewables Now teaser offers no verifiable deal details
The source material contains no article text, so the Eurowind transaction cannot be reported.
- Data centers & fiber
Flexential closes $800 million credit facility for 130MW buildout
An oversubscribed facility shows debt markets underwriting data center capacity ahead of signed leases.
- Fundraising
euNetworks adds design-stage and GRESB targets to €1.26bn SLL
The European fiber operator is tying its credit facility to how projects get planned and how its ESG score moves.
- Data centers & fiber
Proposed ten-story Swanbank data center wins staff backing
The site's appeal is the substation and battery next door, not the building itself.
- Data centers & fiber
Boosteroid's 30 MW buildout is a low-latency stress test
A small GPU footprint shows the wiring that makes interactive streaming work.
- The Wrap
John Laing's US water debut joins a broadening P3 pipeline
The week's P3 roundup runs from a North Carolina parking deck to Union Station, while Washington moves to expand infrastructure financing tools.
- Data centers & fiber
AirJoule and NZIH to test turning data center waste heat into water
The trial will assess whether low-grade waste heat can become usable water inside a working data center.
- Data centers & fiber
Trane and Eaton pair power and cooling in one AI data center design
The companies say their reference design cuts energy use 15 percent and copper 80 percent.
- Energy Transition
A feed item that sells subscriptions, not deals
The only public text from Renewables Now on this item is a pitch for paid plans.
- Energy Transition
Unibep wins Polish contract for solar thermal farm with storage
The contract names a builder and a storage-backed design, with capacity and commercial terms still unreported.
- Energy Transition
Ørsted's Hornsea 3 software pick arrives without figures
The selection is the only verifiable fact in an extract that omits capacity, duration, and cost.
- Energy Transition
QTS, Engie sign 48MW solar PPA for Texas data center
The 48MW contract covers part of Lubio Solar's 61MW output, leaving 13MW without a disclosed buyer.
- Energy Transition
Asahi Kasei electrolyser funding reported; terms undisclosed
Renewables Now's headline is the only public fact; the article's visible text is a subscription pitch.
- Fundraising
Infra-debt 'new era' case is visible only to logged-in readers
Barings' Q&A on Real Assets makes its resilience pitch before a sign-in wall ends the public record.
- Fundraising
Power politics now sets the AI data center calendar
Front-end costs and approval queues, not capital, now decide where hyperscale computing gets built.
- Data centers & fiber
Granite sells Toronto data center to unknown buyer for CA$16.5M
The Scarborough trade prices a working 10-megawatt facility at CA$1.65 million per megawatt.
- Data centers & fiber
Pilot Fiber closes Extenet acquisition, crossing into New Jersey
Pilot's acquisition of Extenet's enterprise fiber business adds more than 20 data center connections and a New Jersey footprint. Terms were not disclosed.
- Data centers & fiber
Rakuten Symphony and Viva Bolivia sign non-binding Open RAN MoU
The pact lays out a cloud-native, Open RAN future for Viva without committing capital or setting a deployment schedule.
- Data centers & fiber
Barings paper argues the AI buildout's limits are physical
The paper ties construction constraints to inflation and margin pressure, landing as hyperscaler commitments keep growing.
- Energy Transition
Apollo, Summit Ridge land $150 million Illinois solar tax equity
The headline confirms parties and size; no project details follow.
- Data centers & fiber
Nebius plans $4.5 billion convertible raise for AI cloud buildout
The two-series note sale can expand past $5 billion with a greenshoe, paying for GPUs and data center construction while revenue still catches up.
- Energy Transition
OPC Energy raises $200.6m with the terms unstated
The energy-transition label fits the borrower, not the deal, and the public record says nothing about what the cash will fund.
- Data centers & fiber
Nvidia guarantees first 4.25GW of OpenAI's Ohio data center
Nvidia's balance sheet now stands behind OpenAI's 10GW-scale data center.
- Data centers & fiber
Renewables Now flags Equinix Singapore solar deal
A single headline points to a solar off-take by Equinix in Singapore; no terms or confirmation are in view.
- Data centers & fiber
New South Wales ties data center approval to 40% wind power
New South Wales will require new data centers to buy wind power for 40% of their electricity before approval.