A working paper models 14,073 sites and puts 61% of expected flood, wind and wildfire losses on equipment.

$4.4BAnnual expected flood, wind and wildfire losses

At a glance

  1. The paper, Risk in the Racks, models 14,073 operating data centers in 187 countries holding $2.8 trillion of buildings and equipment.
  2. The due-diligence question for allocators is what the building is worth after the lease and the debt have run.
  3. Equipment accounts for 61% of expected loss, and about three-quarters of all expected loss is uninsured, according to the paper.

Data center landlords underwrite 15-year leases while expected flood, wind and wildfire losses run $4.4 billion a year, mostly in equipment, according to a working paper detailed in IPE Real Assets.

The paper, Risk in the Racks, models 14,073 operating data centers in 187 countries holding $2.8 trillion of buildings and equipment. It puts expected losses at about 1% of revenue.

The due-diligence question for allocators is what the building is worth after the lease and the debt have run. Data center ABS typically repay in about five years, while the building has a 25–30-year life. On a high-emissions path, total climate cost including extra cooling and water rises from 1% of revenue today to 1.6% by 2050 and 3.8% by 2100, the paper estimates.

Equipment accounts for 61% of expected loss, and about three-quarters of all expected loss is uninsured, according to the paper. Hyperscale tenants sign for about 15 years on take-or-pay terms, and at an IPE Real Assets conference in Munich this year a senior infrastructure investor said those contracts carry no volume risk. On income, Wahib Ghazni writes, that is fair. At colocation sites a landlord's building survey can look clean while most of the exposure sits with tenants. Ghazni writes that "no lease keeps water out of a data hall."

The average loss is manageable. The distribution is not. Just 141 sites, 1% of the total, carry half of expected loss, the paper finds. China including Hong Kong holds 17% of value but half of expected loss, and within a single hub loss rates can differ tenfold between neighborhoods a few kilometers apart. Diversified securitization pools hold up; uninsured single-hub pools in Shanghai, São Paulo and Hong Kong breach cash-trap triggers in 4–6% of years.

One percent of data centers carry half the loss

Share of modelled data centers, and share of their expected annual climate loss

Sites

1%

Expected loss

50%

141 of 14,073 modelled sites carry half of the $4.4 billion annual expected loss.

Source: Risk in the Racks working paper via IPE Real Assets
No lease keeps water out of a data hall.Wahib Ghazni, author of Risk in the Racks

Europe looks comparatively benign at 10 basis points of value a year against 15.6 globally, roughly flat to 2050, and London or Frankfurt pools essentially never breach, according to the paper. Europe's long-run question is water. Under a high-emissions scenario, the share of European capacity in the two highest water-risk tiers rises from 36% to 61% by 2100. Ghazni frames that risk as permits and supply in a drought, not the bill.

The servers, storage and GPUs inside a data center are worth about 70% more than the building, and close to three times as much in AI facilities, according to the paper. They are replaced every few years, they often belong to tenants, and when floodwater gets in they account for three-quarters of the damage. That leaves the landlord with a 25–30-year shell around equipment that turns over on a much shorter cycle and carries most of the climate loss.

Exit planning is already on the agenda: as Private Wealth Daily reported this month, an INREV paper put data center exit planning on par with entry as individual assets grow. That suggests the renewal is where the location risk returns to the landlord.

Reported by the Sectors desk from IPE Real Assets and Private Wealth Daily archive. Published . Corrections

Related

Real Estate

Blue Owl secures close to $8bn net-lease fund as public pensions commit

The raise is the largest described in the IPE Real Assets briefing, which also has JP Morgan Asset Management above $1bn for a debut net-lease fund and three US public pension systems named as investors.

Real Estate

CBRE survey finds half of Asia-Pacific occupiers plan to expand offices

Attendance has reached what the survey calls a steady state, and the same occupiers favour premium buildings in central business districts.

Real Estate

Public pensions are buying the apartment supply gap through a closed-end fund

Six public retirement systems and a $158 million Connecticut acquisition reveal more about this vintage than the $2 billion target.

Real Estate

Class A office rents rise 2.5% as Class B rents slip

Office sales reached $56.9 billion in the first 10 months of 2026 as vacancy fell 140 basis points to 17.2%, Yardi data show.

Real Estate

Apartment sales fall 43% in October

Values slipped 6.3% and garden-style deals dropped 51%, leaving the $7.6 billion sector behind industrial's $9.3 billion, MSCI data show.

Private Real Estate Dailyfrom Private Wealth Daily

Non-traded REITs, data centers, industrial and manager fundraising. Daily at 7:20 a.m. ET.

Free. Every morning. Unsubscribe from any edition in one click.

From other sections