Skip to content
Friday, October 23, 2026 · Today’s edition, 6:30 a.m. ETFri, Oct 23 · 6:30 a.m. editionSign inMy Desk 0EditionsSign in

Colliers lists Austin data center leased to Lumen and LightEdge

The 31,960 sq ft Semicon III building carries $508,000 in annual rent on triple net leases running to 2030 and 2031, with no asking price disclosed.

At a glance

  1. The single-story facility at 2916 Montopolis Drive, known as Semicon III, generates $508,000 in annual rent under triple net leases running to 2030 and 2031, with annual escalations built in.
  2. Built in 1997 on a 2.8-acre site, the property carries 3.2MW of available power.
  3. LightEdge operates the site as its Austin 1 facility and took over both of its Austin data centers in 2019 by acquiring OnRamp, the Austin colocation company that launched Montopolis Drive in 2003.

Colliers is marketing a 31,960 sq ft Austin data center fully leased to Lumen and LightEdge, with no asking price disclosed, Data Center Dynamics reported on October 15.

The single-story facility at 2916 Montopolis Drive, known as Semicon III, generates $508,000 in annual rent under triple net leases running to 2030 and 2031, with annual escalations built in. LightEdge leases 16,480 sq ft and has occupied the building 26 years; Lumen leases 15,480 sq ft across 23 years and runs the site as its Austin 3 data center.

Built in 1997 on a 2.8-acre site, the property carries 3.2MW of available power. The contracted rent works out to about $15.90 per sq ft of annual rent, or roughly $159,000 per megawatt per year.

LightEdge operates the site as its Austin 1 facility and took over both of its Austin data centers in 2019 by acquiring OnRamp, the Austin colocation company that launched Montopolis Drive in 2003. LightEdge, founded in 1996 and based in Des Moines, was acquired by GI Partners from the Anschutz Corporation in September 2021 and operates more than a dozen data centers across seven states.

Reported by the Data centers & fiber desk. Published . Corrections

Related

Infrastructure

LightEdge signs letter of intent for 10-acre Iowa data center campus

The Boone site could draw up to 46MW from utility Alliant, but LightEdge says it will start with a much smaller load and scale over years.

Infrastructure

NxN buys 1MW Évora data center and targets €100m in Portugal

The Évora purchase is NxN's first live asset in Portugal, and the up to €100m investment figure is not tied to a specific project.

Infrastructure

NorthC's Frankfurt bet is the connection, not the megawatts

A 6MW groundbreaking with no named tenant puts the leasing clock on a fixed date in Germany's most contested data center city.

Infrastructure

Foresight signs term sheet for 50.01% of Polish data center developer

Warsaw is planned at 130MW on a secured 32,000 sqm plot with an option on a further 22,000 sqm.

Infrastructure

Telefónica, IQM to install Madrid's first quantum computer by end-2026

The IQM Spark system will give Madrid universities, hospitals and startups direct access to quantum hardware.

Private Infrastructure Dailyfrom Private Wealth Daily

Energy transition, digital infrastructure and core-plus funds. Weekdays at 7:25 a.m. ET.

Free. Weekday mornings. Unsubscribe from any edition in one click.

From other sections