Energy Transition: archive
Every Energy Transition story in Infrastructure, newest first. 506 stories
1 story
Scatec locks Romanian wind financing; terms stay off the wire
The financing is confirmed; the lender, size, and price that would let the market underwrite it are not on the wire.
20 stories
Nextpower patent and 2 GW backlog headline the wire
The headline carries two claims; the supplied record carries nothing else, so the commercial read is inference.
Microsoft's Qcells pact ties data center load to virtual power plants
The expanded deal pairs data center load with dispatchable batteries, putting data center capital behind a new layer of flexible grid capacity.
Enercon secures EUR 1bn guarantee facility, Renewables Now reports
The trade outlet confirms the facility's existence and purpose, but the terms that would let the market price it have not been disclosed.
Hep Global's Regensburg groundbreaking comes without numbers
The construction is confirmed. The figures that would let anyone price it are not.
A 15-GW headline, an article that verifies nothing
The item behind the headline is a subscription pitch, so the claimed installed base cannot be checked or priced.
Pacifico's 2.1 GW Korean wind clearance: claim, not deal
A trade-press headline flags a 2.1 GW Korean wind project, but the public record offers no details behind it.
Plug Power said to drop 100-MW Antwerp green hydrogen project
A reported 100-MW cancellation makes plain that green hydrogen economics run on offtake contracts.
Mahindra Susten reaches financial close on 151-MW Indian hybrid
Financing is closed on an Indian wind-solar hybrid, but the terms that would let an investor price the deal remain unseen.
OMV's e-methanol offtake from Kasso PtX lacks disclosed size
The announcement names the buyer and the project, but the source material carries no volume, price, or timing data.
LG Energy's Michigan launch leaves specs unstated
The public record of the battery plant launch contains no capacity, chemistry, or offtake details.
Island Green's UK battery permit leaves revenue undefined
Ten megawatts of storage for every megawatt of solar makes this a battery project with solar attached; the permit leaves out the commercial terms that would underwrite it.
JA Solar to supply modules for New Zealand's largest rooftop array
A supply contract whose public record stops at a headline, with capacity and ownership still undisclosed.
Rezolv's 192 MW Romanian wind farm enters trial operation
Construction risk is gone. The power-purchase terms that would price the asset are not in the public record.
China's storage fleet hits 136 GW
The 84% growth is the news; the detail behind it is not public.
Distributed Sun Seeds US Platform trutility
A backer and a name are public; the size, mandate, and structure are not.
Tohoku Electric and Nichirei wind PPA: names, then silence
A Renewables Now headline pairs a Japanese utility and a corporate buyer on wind power; the public record stops at the announcement.
Bhutan solar MoU leaves the Indian partner unnamed
Renewables Now's headline names no counterparty, capacity, or timeline for the solar agreement.
Appalachian Power launches 800 MW storage tenders
Renewables Now reported the 800 MW target; the terms that would define the deal are not in the public text.
Atome's 300 MW Paraguay solar plan comes without offtake terms
A utility-scale array feeding an electrolysis load depends on the power purchase agreement the report does not disclose.
APA's $184M Queensland solar-BESS plan: a headline, a paywall, no numbers
Renewables Now's item carries the figure; the offtake details that would size the deal are not in the public text.
19 stories
Burgum lauds LG battery plant as DOE cancels corridors
A cabinet endorsement doesn't substitute for missing capacity, offtake, and grid numbers.
BPA dispatcher warns WECC-1 RAS misses south-to-north flows
The scheme doesn't model south-to-north flows, yet the interconnection studies behind new transmission lines depend on its logic.
AustriaEnergy seeks Chile permit for $150 million wind-plus-storage project
The wind-storage pairing is a bet on price spreads, with capacity, off-take, and schedule still undisclosed.
Headline outruns the details in Sunfire SOEC item
The available text from the Renewables Now item is a subscription pitch, not a project brief.
EDF's 400 MW Nevada solar PPA headline carries no terms
The available extract shows only a headline and a subscription pitch; buyers, sites, and pricing are absent.
Germany awards 2.1 GW in oversubscribed solar tender
The available record is a headline and a subscription pitch, leaving demand visible and economics unstated.
Vestas books 306 MW for unnamed US wind projects
The order is on record; the projects are not yet named — a thin disclosure that leaves the financing question open.
DOE cancels three transmission corridors, citing 'Green New Scam'
Federal backing disappears for lines once justified on reliability grounds, raising the political risk premium for interregional sponsors.
Egypt-Renergy solar item arrives with a future date
A headline dated six months out is the only support for a 3.1 GW solar-storage project claim.
Sosteneo signs 350 MW German wind platform for Fund II debut
The Generali-owned infrastructure manager enters Germany with a majority stake in an 11-project onshore wind fleet, keeping the operator on as a minority shareholder.
Wind headline names MEAG; details absent
A trade item flags a Texas wind exit, but the public record offers no numbers.
Renewables Now teaser offers no verifiable deal details
The source material contains no article text, so the Eurowind transaction cannot be reported.
A feed item that sells subscriptions, not deals
The only public text from Renewables Now on this item is a pitch for paid plans.
Unibep wins Polish contract for solar thermal farm with storage
The contract names a builder and a storage-backed design, with capacity and commercial terms still unreported.
Ørsted's Hornsea 3 software pick arrives without figures
The selection is the only verifiable fact in an extract that omits capacity, duration, and cost.
QTS, Engie sign 48MW solar PPA for Texas data center
The 48MW contract covers part of Lubio Solar's 61MW output, leaving 13MW without a disclosed buyer.
Asahi Kasei electrolyser funding reported; terms undisclosed
Renewables Now's headline is the only public fact; the article's visible text is a subscription pitch.
Apollo, Summit Ridge land $150 million Illinois solar tax equity
The headline confirms parties and size; no project details follow.
OPC Energy raises $200.6m with the terms unstated
The energy-transition label fits the borrower, not the deal, and the public record says nothing about what the cash will fund.